Tender number RFT0692
Ludmilla - Wastewater Treatment Plant - Replacement of Lime Silo Conveyor
Power and Water Corporation requires the installation of a Quick Lime Transfer and Metering System at the Ludmilla Wastewater Treatment Plant. The existing lime handling and metering equipment has reached the end of its serviceable life and is currently not operatable. The upgraded system will provide controlled extraction of quick lime from the existing storage silo and pneumatically transfer the material to the downstream dosing process.
The Contractor shall be responsible for the design, detailing, manufacture, fabrication, supply, installation, inspection and testing of all works under this Contract.
Category:
Procurement method:
Site inspections
Mandatory inspection on 08/10/2026 at 11:00 (Registration Required)
CAL accreditation required
Yes
Technical enquiries
Call 08 8924 5202 (if outside Australia call +61 8 8924 5202)
Region of works
The works will be conducted in the following region(s):
Request For Tender
Release
1/10/2026
Close
02/11/2026 2:00 PM ACST
Award
To be determined
Lodgement details
Electronic lodgement using the eLodgement facility
Faxing to Darwin tenders office on +61 8 8999 1935
The following documents will need to be provided:
- No additional documents are required
Listed by
Power and Water Corporation
GPO Box 1921, Darwin NT 0801
For further enquiries, please contact the Darwin Procurement Office
- Nick Richards
- Social Venture