Ludmilla - Wastewater Treatment Plant - Replacement of Lime Silo Conveyor

Power and Water Corporation requires the installation of a Quick Lime Transfer and Metering System at the Ludmilla Wastewater Treatment Plant. The existing lime handling and metering equipment has reached the end of its serviceable life and is currently not operatable. The upgraded system will provide controlled extraction of quick lime from the existing storage silo and pneumatically transfer the material to the downstream dosing process.

The Contractor shall be responsible for the design, detailing, manufacture, fabrication, supply, installation, inspection and testing of all works under this Contract.

Category:

Electrical/Mechanical

Procurement method:

Public

Site inspections

Mandatory inspection on 08/10/2026 at 11:00 (Registration Required)

CAL accreditation required

Yes

Technical enquiries

Call 08 8924 5202 (if outside Australia call +61 8 8924 5202)

Region of works

The works will be conducted in the following region(s):

Request For Tender

Release

1/10/2026

Close

02/11/2026 2:00 PM ACST

Award

To be determined

Lodgement details

Electronic lodgement using the eLodgement facility

Faxing to Darwin tenders office on +61 8 8999 1935

The following documents will need to be provided:

  • No additional documents are required