A general outline of the work to be carried out under the Contract comprises the removal and replacement of approximately 678 m² of existing roof sheeting with new roof sheeting matching the existing profile, thickness, finish, and installation requirements.
Works shall include the design, supply, removal, and replacement of approximately 70 m of existing box gutter system, including verification of existing site conditions, design of the replacement box gutter system, fabrication, installation, and connection to the existing roof drainage system to ensure the system is fully functional and compliant with relevant requirements.
Works also to include the supply, repair, and reinstatement of 10 mm plasterboard suspended ceilings, existing grid ceilings, and plasterboard walls affected by water ingress, including replacement of damaged materials, finishing, patching, and repainting to match existing conditions.
The Contractor shall inspect existing roof components, including roof framing, insulation, sarking, and roof-mounted equipment, and shall provide report on any damage or deterioration identified during the works.
Region of works
The works will be conducted in the following region(s):
Lodgement details
Electronic lodgement using the eLodgement facility
Faxing to Darwin tenders office on +61 8 8999 1935
The following documents will need to be provided:
- No additional documents are required