Expected release in January 2023
Katherine Region - Victoria Highway - Pavement Strengthening and Widening Ch 118 km to Ch 124 km
A general outline of the work to be carried out under the Contract comprises:
Reconstruction of the existing road carriageway and side drains to improve rideability and durability of formation. This section of road will require strengthening of the subgrade, construction of sub-base and base course. Where existing carriageway width is less than 11 metres, rehabilitation will include widening to 11 metre wide carriageway with 2 traffic lanes of 3.5 metres wide each and 9 metre two coat seal and culvert replacement.
Category:
CAL accreditation required
Yes
Technical enquiries
Call 08 8999 1934 (if outside Australia call +61 8 8999 1934)
Region of works
The works will be conducted in the following region(s):
Listed by
Department of Infrastructure, Planning and Logistics
GPO Box 2520, Darwin NT 0801
For further enquiries, please contact the Darwin Procurement Office