Expected release in January 2023

Future

Katherine - Stuart Highway - Strengthening and Widening Ch 251.40 km to Ch 255.50 km

A general outline of the work to be carried out under the Contract comprises:  Reconstruction of the existing road carriageway and side drains to improve ride ability and durability of formation. This section of road will require strengthening of the subgrade, construction of sub-base and base course. Where existing carriageway width is less than 11 metres, rehabilitation will include widening to 11-metre-wide carriageway with 2 traffic lanes of 3.5 metres wide each and 9 metre two coat seal and culvert replacement. 

 

Category:

Civil

CAL accreditation required

Yes

Technical enquiries

Call 08 8999 1934 (if outside Australia call +61 8 8999 1934)

Region of works

The works will be conducted in the following region(s):

Project officer

Justin Pedersen

08 8973 8668 (if outside Australia call +61 8 8973 8668)

Listed by

Department of Infrastructure, Planning and Logistics

GPO Box 2520, Darwin NT 0801

For further enquiries, please contact the Darwin Procurement Office

You need to login to be able to set notification preferences.

Login
$2,500,000 - $4,999,999
Public