Expected release in November 2023

Future

Palmerston - Design and Documentation of a new Sewer Pond and Modifications to Pond Hydraulics

Background:

The Palmerston Waste Water Treatment Facility (PWWTF) was built in 1981 for a treatment design capacity of 50,000 EP (equivalent population). In the 40 years of service the population of Palmerston has grown to capacity and there has not been any capital upgrades to increase treatment capacity. Recommendations from the master plan for the 15 year planning horizon include the construction of an additional treatment pond with associated changes to the hydraulic operation of the existing ponds.  

Description of Procurement Activity:

Provide a detailed design for a new sewer treatment pond and modifications to the existing hydraulic flows within the pond sets.

Deliverables:

Detailed design drawings, construction specifications, scope of works for construction and pricing schedule.

Category:

Consultancy

CAL accreditation required

No

Technical enquiries

Call 08 8999 1934 (if outside Australia call +61 8 8999 1934)

Region of works

The works will be conducted in the following region(s):

Project officer

PWC Procurement

08 8924 5013 (if outside Australia call +61 8 8924 5013)

Listed by

Power and Water Corporation

GPO Box 1921, Darwin NT 0801

For further enquiries, please contact the Darwin Procurement Office

You need to login to be able to set notification preferences.

Login
$0 - $499,999
Public