Expected release in November 2024

Future

Darwin - Wulagi Primary School - Replace with a Building Energy Rated Roof and Associated Works

Replacement of Roof in Zone B at Wulagi Primary School, including but not limited to associated items and works such as:

  • Remove and discard existing roof deck, vapour barrier, bulk insulation and safety mesh
  • Remove existing steel box gutters and make good corrosion to steel supports
  • Remove and discard asbestos facia
  • Remove and replace all dry pans for Skylight on Roof Zone
  • Remove and replace downpipe spreaders on roof
  • Allow to check and service existing roof mounted exhaust fans
  • Remove and replace all capping flashings to perimeter parapets
  • Allow to clean and prime existing exposed roof purlins and supply additional trimmer purlins at all service penetrations
  • Supply and install vapour barrier over entire air-conditioned roof
  • Supply and install colorbond kliplok with screws and cyclone washers
  • Supply and install stainless steel box gutter with flashings
  • Reinstate all roof mounted equipment
  • Supply and install dektites to all pipe penetrations
  • Check all downpipes are free flowing, make good as required 
  • In accordance with Building Energy Rating (BER) standards
  • Obtain relevant Building Permits

 

 

Category:

Building

CAL accreditation required

Yes

Technical enquiries

Call 08 8999 1934 (if outside Australia call +61 8 8999 1934)

Region of works

The works will be conducted in the following region(s):

Project officer

Brendan Clough

08 8946 5176 (if outside Australia call +61 8 8946 5176)

Listed by

Department of Logistics and Infrastructure

GPO Box 2520, Darwin NT 0801

For further enquiries, please contact the Darwin Procurement Office

You need to login to be able to set notification preferences.

Login
$500,000 - $999,999
Public