Tender Details

Q22-0091

Q22-0091

Consultancy - Renewable Energy Hub Governance

The Department of Industry, Tourism and Trade (DITT), through the Office of Sustainable Energy (OSE), is seeking to understand the optimal approach to;

1. Deliver the power system investments required to extend the existing power system to the RE Hub in the committed timeframe with suitable cost allocation and/or cost recovery frameworks.

2. Establish and operate a RE Hub, including consideration of the required infrastructure investment and cost allocations, preferred commercial structures and arrangements, as well as suitable long operational governance and management frameworks.

This is intended to provide sufficient information for the NTG to progress the RE Hub and to develop any relevant regulations, and/or other arrangements by the end of 2022.

The establishment of clear, transparent and practical arrangements is critical to providing the confidence and predictability that underpin investment decisions in the power system.

Public

Department of Industry, Tourism and Trade

GPO Box 3200, Darwin NT 0801

Archived

Quote

21/03/2022

04/04/2022 14:00 ACST

16/05/2022

Miscellaneous

Darwin

Awarded Contractors

Contract Value: $329,461.00

Basis of Payment: Lump sum

  • EPC Technologies Pty Ltd

    Business Name: EPC Technologies

    Address: L6, 123 Eagle St, BRISBANE QLD 4000

    Amount: $329,461.00

    ABN: 64 612 341 849

    Territory Enterprise: No

    Aboriginal Enterprise: No

    Women Owned: No Information available

Closing List

Click here to see the list of responding tenderers at closing.

Prospective Tenderers

Click here to see the list of tenderers who have downloaded this tender.

Back to List Back to Search