Tender Details

CWD00079-23

CWD00079-23

Detailed Design of Palmerston Waste Stabilisation Pond Inlet Works Upgrade

The Palmerston Waste Water Treatment Facility (PWWTF) was built in 1981 for a treatment design capacity of 50,000 EP (equivalent population). In the 40 years of service the population of Palmerston has grown to capacity and there has not been any capital upgrades to increase treatment capacity. Recommendations from the master plan for the 15 year planning horizon include the construction of an additional treatment pond with associated changes to the hydraulic operation of the existing ponds.

Public

Power and Water Corporation

GPO Box 1921, Darwin NT 0801

Archived

Tender

6/12/2024

28/01/2025 14:00 ACST

27/03/2025

Consultancy

Tender Work Regions

Awarded Contractors

Contract Value: $791,144.21

Basis of Payment: Lump sum

  • Hunter H2O Holdings Pty Limited

    Business Name: Beca HunterH2O

    Address: 19 Spit Island Close, NEWCASTLE NSW 2304

    Amount: $791,144.21

    ABN: 16 602 201 552

    Territory Enterprise: No

    Aboriginal Enterprise: No

    Women Owned: No Information available

Closing List

Click here to see the list of responding tenderers at closing.

Prospective Tenderers

Click here to see the list of tenderers who have downloaded this tender.

Back to List Back to Search