Tender number CWD00079-23

Archived

Detailed Design of Palmerston Waste Stabilisation Pond Inlet Works Upgrade

The Palmerston Waste Water Treatment Facility (PWWTF) was built in 1981 for a treatment design capacity of 50,000 EP (equivalent population). In the 40 years of service the population of Palmerston has grown to capacity and there has not been any capital upgrades to increase treatment capacity. Recommendations from the master plan for the 15 year planning horizon include the construction of an additional treatment pond with associated changes to the hydraulic operation of the existing ponds.

Category:

Consultancy

Procurement method:

Public

CAL accreditation required

No

Technical enquiries

Call 08 8985 7113 (if outside Australia call +61 8 8985 7113)

Region of works

The works will be conducted in the following region(s):

Request For Tender

Release

6/12/2024

Close

28/01/2025

Award

27/03/2025

Lodgement details

Electronic lodgement using the eLodgement facility

Faxing to Darwin tenders office on +61 8 8999 1935

The following documents will need to be provided:

  • No additional documents are required

Listed by

Power and Water Corporation

GPO Box 1921, Darwin NT 0801

For further enquiries, please contact the Darwin Procurement Office

Lump sum of $791,144.21

Awarded

$791,144.21

Hunter H2O Holdings Pty Limited

Beca HunterH2O

ABN: 16 602 201 552

19 Spit Island Close, NEWCASTLE NSW 2304

Territory Enterprise: No

Aboriginal Enterprise: No

Women Owned: Information not available