Tender number T22-1159
Royal Darwin Hospital - Managing Contractor Contract - Construction of New Mental Health Inpatient Unit and Associated Works - Mandatory Site Inspection
The work to be carried out under the Contract comprises the delivery of:
(Works Package 1) the planning, construction and commissioning of a new three storey building housing a Mental Health Inpatient Unit, Stabilisation and Referral area, and a third level cold shell only; and
(Works Package 2) the planning, construction and commissioning of an upgrade of the Central Sterilisation Services Department (CSSD) within the existing Main Ward building.
Works Package 1 and Works Package 2 must be carried out in accordance with the Contract and Existing Design (note the Existing Design is not yet complete).
Category:
Procurement method:
Site inspections
Mandatory inspection on 27/07/2022 at 09:00 (Registration Required)
CAL accreditation required
Yes
Technical enquiries
Call 08 8946 5082 (if outside Australia call +61 8 8946 5082)
Region of works
The works will be conducted in the following region(s):
Request For Tender
Release
18/07/2022
Close
7/09/2022
Award
10/01/2023
Lodgement details
Electronic lodgement using the eLodgement facility
Faxing to Darwin tenders office on +61 8 8999 1935
The following documents will need to be provided:
- Building Code
- WHS Accreditation Scheme for Commonwealth building work
Listed by
Department of Infrastructure, Planning and Logistics
GPO Box 2520, Darwin NT 0801
For further enquiries, please contact the Darwin Procurement Office
Target cost of $57,695,000.00
Awarded
$57,695,000.00
Sitzler Pty Ltd
Sitzler
ABN: 17 091 273 013
PO Box 39062, WINNELLIE NT 0821
Territory Enterprise: Yes
Aboriginal Enterprise: No
Women Owned: Information not available
- Halikos Pty Ltd
- Sitzler Pty Ltd
- A1 Thermal Pty Ltd
- Ace Admin Services NT
- Acecom NT Pty Ltd
- Acer Forester Pty Ltd
- Amir D
- ...