Tender number NWY00008-22

Archived

Yulara - Supply and Install of Waste Water Treatment Plant Control Building and Electrical

Yulara Wastewater Treatment Plant (YWWTP) provides treatment of wastewater from the Yulara (Ayers Rock) Resort and adjacent areas. The treatment process consists of primary screening, grit removal and activated sludge treatment with effluent stabilisation and discharge to the adjacent tree farm.  

The control switchboard and cabling at YWWTP is at the end of its life and requires replacing.

This RFT is for the supply, installation and commissioning of a control room with new motor control cubicle and associated site cabling to run the existing Yulara Waste Water Treatment Plant.  

Category:

Electrical/Mechanical

Procurement method:

Public

CAL accreditation required

Yes

Technical enquiries

Call 08 8951 7325 (if outside Australia call +61 8 8951 7325)

Region of works

The works will be conducted in the following region(s):

Request For Tender

Release

15/03/2023

Close

2/05/2023

Award

27/07/2023

Lodgement details

Electronic lodgement using the eLodgement facility

The following documents will need to be provided:

  • No additional documents are required

Listed by

Power and Water Corporation

GPO Box 1921, Darwin NT 0801

For further enquiries, please contact the Darwin Procurement Office

Lump sum of $1,803,098.00

Awarded

$1,803,098.00

SAGE Automation Pty Ltd

SAGE Automation

ABN: 59 104 119 833

65 Jessop Cres, BERRIMAH NT 0828

Territory Enterprise: Yes

Aboriginal Enterprise: No

Women Owned: Information not available