Tender number CWD00079-23
Detailed Design of Palmerston Waste Stabilisation Pond Inlet Works Upgrade
The Palmerston Waste Water Treatment Facility (PWWTF) was built in 1981 for a treatment design capacity of 50,000 EP (equivalent population). In the 40 years of service the population of Palmerston has grown to capacity and there has not been any capital upgrades to increase treatment capacity. Recommendations from the master plan for the 15 year planning horizon include the construction of an additional treatment pond with associated changes to the hydraulic operation of the existing ponds.
Category:
Procurement method:
CAL accreditation required
No
Technical enquiries
Call 08 8985 7113 (if outside Australia call +61 8 8985 7113)
Region of works
The works will be conducted in the following region(s):
Request For Tender
Release
6/12/2024
Close
28/01/2025
Award
27/03/2025
Lodgement details
Electronic lodgement using the eLodgement facility
Faxing to Darwin tenders office on +61 8 8999 1935
The following documents will need to be provided:
- No additional documents are required
Listed by
Power and Water Corporation
GPO Box 1921, Darwin NT 0801
For further enquiries, please contact the Darwin Procurement Office
Lump sum of $791,144.21
Awarded
$791,144.21
Hunter H2O Holdings Pty Limited
Beca HunterH2O
ABN: 16 602 201 552
19 Spit Island Close, NEWCASTLE NSW 2304
Territory Enterprise: No
Aboriginal Enterprise: No
Women Owned: Information not available
- Ganden Pty Ltd
- GHD Pty Ltd
- Hunter H2O Holdings Pty Limited
- Innovative Filtration Solutions Pty Ltd
- ADG Engineers ( Aust ) Pty Ltd
- Advanced Projects
- Align Consulting Engineers Pty Ltd
- Aquanex Pty Ltd
- Aquatec Fluid Systems
- ...