The scope of works is the design and construction of approximately 13.5 km of DN100 underground communications pipe and pits for a future fibre optic cable (installation of cable not part of this scope). The works are to take place within existing Power and Water easements. Works include:
· Design of alignment
· Design of conduit and pits
· Survey of alignment
· Mobilisation and demobilisation
· Obtain Before You Dig Australia (BYDA) information and liaise with service providers as required
· Pre construction dilapidation survey and report
· Provision of site facilities
· Identification and protection of services
· Liaison with property owners, tenants, and other stakeholders
· Traffic management
· Clearing and grubbing
· Excavation
· Bedding and Installation of conduit and pits
· Backfill and compaction of trench
· Clean conduits and install draw wire
· Reinstatement of all surfaces
· Directional drilling under roads and major creeks
· Creek crossings under minor creeks
· Reinstatement of fencing, irrigation and other property to original condition as required
· Any other item required to make good to existing condition of alignment
· As constructed drawings
Region of works
The works will be conducted in the following region(s):
Lodgement details
Electronic lodgement using the eLodgement facility
Faxing to Darwin tenders office on +61 8 8999 1935
The following documents will need to be provided:
- No additional documents are required