Tender number RFT0349

Current

Darwin - Ludmilla Waste Water Treatment Plant Rectification Works - Inlet Chamber, Penstock Chamber & Pump Room

The Ludmilla Wastewater Treatment Plant (WWTP) is a critical part of PWC infrastructure required for the Darwin city region sewage treatment and disposal. Failure of this facility would result in both health and safety risks to the community and environmental damage.

It has been identified that some areas including the inlet chamber; penstock access chamber and penstock; and pump room access stairs are in immediate need to rectification.

Category:

Building

Procurement method:

Public

Site inspections

Mandatory inspection on 20/10/2025 at 10:00 (Registration Required)

CAL accreditation required

Yes

Technical enquiries

Call 0438 256 358 (if outside Australia call +61 438 256 358)

Region of works

The works will be conducted in the following region(s):

Request For Quote

Release

15/10/2025

Close

12/11/2025 2:00 PM ACST

Award

To be determined

Lodgement details

Electronic lodgement using the eLodgement facility

Faxing to Darwin tenders office on +61 8 8999 1935

The following documents will need to be provided:

  • No additional documents are required

Listed by

Power and Water Corporation

GPO Box 1921, Darwin NT 0801

For further enquiries, please contact the Darwin Procurement Office

  • Accelerator
  • ACM Resources (Australia) Pty Ltd
  • adros nt
  • Alliance Automation Pty Ltd
  • Aquatec Fluid Systems
  • ...
View Full List