Tender number RFT0349
Darwin - Ludmilla Waste Water Treatment Plant Rectification Works - Inlet Chamber, Penstock Chamber & Pump Room
The Ludmilla Wastewater Treatment Plant (WWTP) is a critical part of PWC infrastructure required for the Darwin city region sewage treatment and disposal. Failure of this facility would result in both health and safety risks to the community and environmental damage.
It has been identified that some areas including the inlet chamber; penstock access chamber and penstock; and pump room access stairs are in immediate need to rectification.
Category:
Procurement method:
Site inspections
Mandatory inspection on 20/10/2025 at 10:00 (Registration Required)
CAL accreditation required
Yes
Technical enquiries
Call 0438 256 358 (if outside Australia call +61 438 256 358)
Region of works
The works will be conducted in the following region(s):
Request For Quote
Release
15/10/2025
Close
12/11/2025 2:00 PM ACST
Award
To be determined
Lodgement details
Electronic lodgement using the eLodgement facility
Faxing to Darwin tenders office on +61 8 8999 1935
The following documents will need to be provided:
- No additional documents are required
Listed by
Power and Water Corporation
GPO Box 1921, Darwin NT 0801
For further enquiries, please contact the Darwin Procurement Office
- Accelerator
- ACM Resources (Australia) Pty Ltd
- adros nt
- Alliance Automation Pty Ltd
- Aquatec Fluid Systems
- ...