Expected release in February 2026
Katherine - Katherine Water Treatment Plant UV System Improvement
Deliverables Design and Construct UV Treatment Plant inclusive of the following:
- Construction of treatment plant building
- Implementation of temporary bypass
- UV disinfection process including reactors and control apparatus
- Clearwater pump station including pumps and control apparatus Preliminary Business Case
- Chlorination and fluoridation system upgrades
- All reticulation pipework including cutovers and connections
- Clear span enclosed building including gantry crane
- Climate controlled equipment shelter for UV process control equipment
- Power supply upgrades, including the provision of increased backup generation capacity (and load cell)
- Sampling and monitoring upgrades and integration into KWTP operations
- SCADA upgrades and integration as necessary for the new process
- Commission, cut over and accept into service.
Manage and resolve any operational improvements and optimisations evolved in early operations.
Price Range Estimated at $10M - $20M
Category:
CAL accreditation required
No
Technical enquiries
Call 08 8999 1934 (if outside Australia call +61 8 8999 1934)
Listed by
Power and Water Corporation
GPO Box 1921, Darwin NT 0801
For further enquiries, please contact the Darwin Procurement Office