Expected release in February 2026

Future

Katherine - Katherine Water Treatment Plant UV System Improvement

Deliverables Design and Construct UV Treatment Plant inclusive of the following:

- Construction of treatment plant building

- Implementation of temporary bypass

-  UV disinfection process including reactors and control apparatus

-  Clearwater pump station including pumps and control apparatus Preliminary Business Case

-  Chlorination and fluoridation system upgrades

-  All reticulation pipework including cutovers and connections

-  Clear span enclosed building including gantry crane

-  Climate controlled equipment shelter for UV process control equipment

-  Power supply upgrades, including the provision of increased backup generation capacity (and load cell)

- Sampling and monitoring upgrades and integration into KWTP operations

-  SCADA upgrades and integration as necessary for the new process

-   Commission, cut over and accept into service.

Manage and resolve any operational improvements and optimisations evolved in early operations.

Price Range Estimated at $10M - $20M

Category:

Hydraulic

CAL accreditation required

No

Technical enquiries

Call 08 8999 1934 (if outside Australia call +61 8 8999 1934)

Region of works

The works will be conducted in the following region(s):

Project officer

PWC Procurement

08 8924 5013 (if outside Australia call +61 8 8924 5013)

Listed by

Power and Water Corporation

GPO Box 1921, Darwin NT 0801

For further enquiries, please contact the Darwin Procurement Office