Expected release in November 2025
Parliament House Darwin - Modernisation and Replacement Works of 6 Elevators with Maintenance Period
Scheduled equipment modernisation works for 4 elevators and the replacement of 2 elevators.
Works include:
- Equipment and lift car modernisation for 4 elevators, including: running gear, lift shell, Cabin Operating Panels (COPs), and internal lift fitout etc.
- Full lift removal and replacement of 2 existing lifts. Provide new lift to suit existing shaft dimensions.
- Maintenance Period for all existing lifts (including those made modern and new) during the works.
Category:
CAL accreditation required
Yes
Technical enquiries
Call 08 8999 1934 (if outside Australia call +61 8 8999 1934)
Region of works
The works will be conducted in the following region(s):
Listed by
Department of Logistics and Infrastructure
GPO Box 2520, Darwin NT 0801
For further enquiries, please contact the Darwin Procurement Office