Expected release in April 2026
Alice Springs Correctional Centre - F Block - Replace Distribution Board and Provision of Back-up Power Throughout Construction Period
Replacement of existing non-essential and essential main distribution boards with a new all essential main distribution board, located in block F at Alice Springs Correctional Centre (ASCC).
The contractor shall be responsible for programming, detailed coordination, and sequencing of works in conjunction with the project superintendent and facility operators to ensure there is no disruption to normal working conditions/operations, including but not limited to:
- Supply & install of temporary distribution switchboard(s)
- Supply and install temporary generators, fuel storage tanks, fuel, temporary cables, cable ways and cable covers.
Category:
CAL accreditation required
Yes
Technical enquiries
Call 08 8999 1934 (if outside Australia call +61 8 8999 1934)
Listed by
Department of Logistics and Infrastructure
GPO Box 2520, Darwin NT 0801
For further enquiries, please contact the Darwin Procurement Office