Tender number NWD00804-21
Gapuwiyak - Construction of New Elevated and Ground Level Water Tanks
A review the water storage requirements for Gapuwiyak has revealed that there is a shortfall in ground level storage volume required to meet the ICEG guidelines and a condition assessment on the existing elevated storage tank indicates that the tank has reached its end of life. As such, PWC proposes to engage a competent Principal Contractor to install a new ground level tank and new elevated tank (including tank stand) and undertake refurbishment of the transfer pump station under a Design and Construct (D&C) contract.
Category:
Procurement method:
Industry briefing details
Mandatory briefing on 05/03/2021 at 10:00 (Registration Required)
CAL accreditation required
Yes
Technical enquiries
Call 0418 758 702 (if outside Australia call +61 418 758 702)
Region of works
The works will be conducted in the following region(s):
- Darwin
Request For Tender
Release
26/02/2021
Close
13/04/2021
Award
6/10/2021
Lodgement details
Electronic lodgement using the eLodgement facility
Faxing to Darwin tenders office on +61 8 8999 1935
Lodging by mail: GPO Box 1551, Darwin, Northern Territory, Australia, 0801
The following documents will need to be provided:
- No additional documents are required
Listed by
Power and Water Corporation
GPO Box 1921, Darwin NT 0801
For further enquiries, please contact the Darwin Procurement Office
Lump sum of $3,712,007.20
Awarded
$3,712,007.20
Delta Pty Ltd
GPO Box 3521, DARWIN NT 0801
Territory Enterprise: Yes
Aboriginal Enterprise: No
Women Owned: Information not available
- Delta Pty Ltd
- Duratec Limited
- Ribshire Pty Ltd
- Yingwati Pty Ltd
- Saunders International Ltd
- AB Drillingservices
- Aertex Group Pty Ltd
- Aitken Freeman Pty Ltd
- Akron Group
- ...