Tender number Q22-0134
Darwin - Renewable Energy Hub - Power System Studies
The Department of lndustry, Tourism and Trade (DITT), through the Office of Sustainable Energy (OSE), is seeking to investigate:
- Network configuration options with associated load flow and concept designs required to extend the existing electricity system to the RE Hub in the committed timeframe with associated costs; and
- Preliminary connections/due diligence studies required to connect the generators in the RE Hub for a more detailed study of the issues.
This is intended to provide sufficient information for the NTG to progress the RE Hub and to extend the network and required connections. The establishment of efficient and effective network configurations and connections are critical to providing the confidence, predictability and security that underpin investment decisions in the electricity system.
Category:
Procurement method:
CAL accreditation required
No
Technical enquiries
Call 08 8999 5008 (if outside Australia call +61 8 8999 5008)
Region of works
The works will be conducted in the following region(s):
- Darwin
Request For Quote
Release
12/04/2022
Close
9/05/2022
Award
8/07/2022
Lodgement details
Electronic lodgement using the eLodgement facility
Faxing to Darwin tenders office on +61 8 8999 1935
The following documents will need to be provided:
- No additional documents are required
Listed by
Department of Industry, Tourism and Trade
GPO Box 3200, Darwin NT 0801
For further enquiries, please contact the Darwin Procurement Office
Lump sum of $262,085.46
Awarded
$262,085.46
Merz Consultancy Pty Ltd
ABN: 78 169 551 320
L2, 524 Hay St, PERTH WA 6000
Territory Enterprise: No
Aboriginal Enterprise: No
Women Owned: Information not available
- Alliance Power and Data Pty Ltd
- EPC Technologies Pty Ltd
- Ernst & Young
- GHD Pty Ltd
- Global Power Energy Pty Ltd
- ...
- ABB Australia Pty Limited
- ABB Power Grids Malaysia Sdn Bhd
- ACIL Allen Pty Limited
- Advisian Pty Ltd
- Aertex Group Pty Ltd
- ...