Tender number NWY00008-22
Yulara - Supply and Install of Waste Water Treatment Plant Control Building and Electrical
Yulara Wastewater Treatment Plant (YWWTP) provides treatment of wastewater from the Yulara (Ayers Rock) Resort and adjacent areas. The treatment process consists of primary screening, grit removal and activated sludge treatment with effluent stabilisation and discharge to the adjacent tree farm.
The control switchboard and cabling at YWWTP is at the end of its life and requires replacing.
This RFT is for the supply, installation and commissioning of a control room with new motor control cubicle and associated site cabling to run the existing Yulara Waste Water Treatment Plant.
Category:
Procurement method:
CAL accreditation required
Yes
Technical enquiries
Call 08 8951 7325 (if outside Australia call +61 8 8951 7325)
Request For Tender
Release
15/03/2023
Close
2/05/2023
Award
27/07/2023
Lodgement details
Electronic lodgement using the eLodgement facility
The following documents will need to be provided:
- No additional documents are required
Listed by
Power and Water Corporation
GPO Box 1921, Darwin NT 0801
For further enquiries, please contact the Darwin Procurement Office
Lump sum of $1,803,098.00
Awarded
$1,803,098.00
SAGE Automation Pty Ltd
SAGE Automation
ABN: 59 104 119 833
65 Jessop Cres, BERRIMAH NT 0828
Territory Enterprise: Yes
Aboriginal Enterprise: No
Women Owned: Information not available
- Fredbuild Pty Ltd
- Nepean Power Pty Ltd
- SAGE Automation Pty Ltd
- Aertex Group Pty Ltd
- Alliance Automation Pty Ltd
- ANT Galactic.Pty.Ltd
- Aquatec Fluid Systems
- BCI Australia Pty Ltd
- ...