Tender number T19-2324
Darwin Region - Litchfield National Park - Central Valley - Stage 3 Construction of Campsite, Day-Use Area and Associated 4WD Access Tracks
Construct 4wd track 2a from the Staging Area to the Northern Campgrounds, two loop roads (Road 1 and 2) and 10 campsites within Site 1.
Category:
Procurement method:
Site inspections
Inspection on 19/05/2020 at 10:00 (Registration Required)
CAL accreditation required
Yes
Technical enquiries
Call 0431 423 509 (if outside Australia call +61 431 423 509)
Region of works
The works will be conducted in the following region(s):
- Darwin
Request For Tender
Release
8/05/2020
Close
5/06/2020
Award
10/07/2020
Lodgement details
Electronic lodgement using the eLodgement facility
Faxing to Darwin tenders office on +61 8 8999 1935
The following documents will need to be provided:
- No additional documents are required
Listed by
Department of Infrastructure, Planning and Logistics
GPO Box 2520, Darwin NT 0801
For further enquiries, please contact the Darwin Procurement Office
Schedule of rates of $1,588,582.30
Awarded
$1,588,582.30
Ostojic Group Pty Ltd
PO Box 38915, WINNELLIE NT 0821
Territory Enterprise: Yes
Aboriginal Enterprise: Information not available
Women Owned: Information not available
- Aldebaran Contracting Pty Ltd
- Mak Mak Construction Pty Ltd
- Ostojic Group Pty Ltd
- TB Construction (NT) Pty Ltd
- THE Mining Pty Ltd
- 3monkeez
- AAM Pty Limited
- ABC
- Access Hardware PTY LTD
- ADG Engineers ( Aust ) Pty Ltd
- ...