Expected release in September 2026
Ludmilla - Wastewater Treatment Plant - Replacement of Lime Silo Conveyor
Power and Water Corporation (PWC) requires the installation of a Quick Lime Transfer and Metering System at the Ludmilla Wastewater Treatment Plant (LWWTP). The existing lime handling and metering equipment has reached the end of its serviceable life and is currently not operatable. The upgraded system shall provide controlled extraction of quick lime from the existing storage silo and pneumatically transfer the material to the downstream dosing process.
Category:
CAL accreditation required
No
Technical enquiries
Call 08 8999 1934 (if outside Australia call +61 8 8999 1934)
Region of works
The works will be conducted in the following region(s):
Listed by
Power and Water Corporation
GPO Box 1921, Darwin NT 0801
For further enquiries, please contact the Darwin Procurement Office